We Built the Bridge
 

<= New Bridge

Preliminary Drawings =>


The people shown in these frames are some of the numerous workers who were needed to build the Bay Bridge. Their work was completed in difficult conditions, battling the Bay Area fog and wet weather, and long hours with often only a single steel beam between them and the waters of the Bay below. This workforce poured concrete, surveyed routes, drove innumerable rivets, painted the spans, bored tunnels through Yerba Buena Island, and welded girders in order to complete the construction in only forty months. On average, 6,000 people were employed at any one time during construction. The bridge was one of the largest public works projects in the nation, helping ease the affects of the Great Depression in California.

Click on a thumbnail to view an enlarged copy of the image, then click on the BACK button to return to this page.


288 Ft. Span E-22, 9–6–34.

288 Ft. Span E-22

Department of Public Works
Bridge Department
California State Archives
Sacramento, California


Suspender Protective Seizing, 1–8–36.

Suspender Protective Seizing

Department of Public Works
Bridge Department
California State Archives
Sacramento, California


South Cable - Center Anchorage, 9–1335–.

South Cable - Center Anchorage

Department of Public Works
Bridge Department
California State Archives
Sacramento, California


Suspended Span, Chas. E. Andrew - Bridge Engineer, 7–23–36.

Suspended Span, Chas. E. Andrew - Bridge Engineer

Department of Public Works
Bridge Department
California State Archives
Sacramento, California


South Cable - Span W1-W2, 12–4–35.

South Cable - Span W1-W2

Department of Public Works
Bridge Department
California State Archives
Sacramento, California


South Cable - Midspan W2-W3, 8–9–35.

South Cable - Midspan W2-W3

Department of Public Works
Bridge Department
California State Archives
Sacramento, California


Reinforcing Steel, 4–30–35.

Reinforcing Steel

Department of Public Works
Bridge Department
California State Archives
Sacramento, California


Reinforcing Steel, 6–20–35.

Strand Shoes - South Cable - W4

Department of Public Works
Bridge Department
California State Archives
Sacramento, California


Y.B. Viaduct - Curing Seal, 6–28–35.

Y.B. Viaduct - Curing Seal

Department of Public Works
Bridge Department
California State Archives
Sacramento, California


North Anchorage Tunnel, 5–1–34.

North Anchorage Tunnel

Department of Public Works
Bridge Department
California State Archives
Sacramento, California


East Cantilever Arm, 10–22–36.

East Cantilever Arm

Department of Public Works
Bridge Department
California State Archives
Sacramento, California


South Cable - Saddle W2, 7–10–35.

South Cable - Saddle W2

Department of Public Works
Bridge Department
California State Archives
Sacramento, California


South Cable - Y.B. Anchorage, 5–26–36.

South Cable - Y.B. Anchorage

Department of Public Works
Bridge Department
California State Archives
Sacramento, California


Expansion Dam - Span W1 - W2, 6–2–36.

Expansion Dam - Span W1-W2

Department of Public Works
Bridge Department
California State Archives
Sacramento, California