Preliminary Drawings
 

<= We Built the Bridge

The Intrepid Diver =>


In early 1932, the Department of Public Works–Division of Highways completed preliminary drawings for the bridge’s construction. However, some of these initial plans were altered prior to construction. The drawing at left, for example, shows a suspension bridge on the eastern span as it approaches the Yerba Buena Island. This was later changed to a cantilever section. The drawing at right is of a design that was followed for the towers on the western span of the bridge.

Click on a thumbnail to view an enlarged copy of the image, then click on the BACK button to return to this page.


West Bay Crossing, Center Anchorage – C.A.I. –Towers.

West Bay Crossing, Center Anchorage – C.A.I. –Towers

Department of Public Works
Division of Highways
California State Archives
Sacramento, California


East Bay Crossing, General Plan & Elevation.

East Bay Crossing, General Plan & Elevation

Department of Public Works
Division of Highways
California State Archives
Sacramento, California



Go to We Built the Bridge
Go to The Intrepid Diver


Copyright ©2000-2009 LearnCalifornia.org. All rights reserved.